Skip to content

Calendar Overview

Schedule content publication dates with the Vivreal calendar

beginner5 min readFor portal users

Calendar

The Vivreal calendar lets you visualize your content pipeline and schedule when collection objects go live. Objects with publish dates appear on the calendar automatically.

Opening the Calendar

Tap the Calendar tab in the bottom navigation bar.

Calendar Views

The calendar supports multiple views you can switch between using the toolbar:

ViewBest For
MonthBig-picture planning, seeing publication density across weeks
WeekDetailed scheduling for the current or upcoming week
DayFocusing on a single day's content schedule

Use the Today button to jump back to the current date, and the arrow buttons to navigate forward or backward.

Scheduling Publish Dates

The calendar's main purpose is setting publish dates on your collection objects. When you schedule an object, its publishDate is updated directly — the calendar doesn't create separate events.

Open the schedule dialog

Tap the + button or tap a date on the calendar to open the scheduling dialog.

Select a collection

Choose a collection from the dropdown. The objects in that collection are displayed in a table.

Queue objects

Check the objects you want to schedule. You can switch collections and queue objects from multiple collections at once. Your queued items are shown at the bottom.

Pick a date and time

Use the date picker and time picker to choose when the selected objects should be published.

Schedule

Tap Schedule to set the publish date on all queued objects. They'll appear on the calendar at the scheduled date.

Scheduling sets the publish date directly on the collection object. Once the publish date is in the past, the object becomes visible through the Client API — no additional action needed.

Viewing Scheduled Content

Objects with publish dates appear on the calendar automatically. Tap any item on the calendar to view its details or reschedule it.

Editing a Scheduled Object

Tap an object on the calendar to open the update dialog. From here you can:

  • Reschedule — change the publish date and time
  • Draft — remove the publish date to take the object back to draft status

Tips for Effective Scheduling

  • Plan weekly — use the week view at the start of each week to map out your content schedule
  • Batch schedule — queue objects from multiple collections and schedule them all at once
  • Review in month view — switch to month view to ensure consistent content coverage